Copyright 2002 T. Sheil & A. Sheil All Rights Reserved
The initial stages of village work includes placing the boards, covering them with white ground (we use vinyl tablecloths with the white underside - they lay flatter, last longer) and then placing buildings. Here are some photos of this year's early stages.
Ground cover is down - since the tree is so low, I have to work back-to-front. The left building actually conceals a surge protector. To the right are Modern Village buildings, in place but not wired. Track always goes first, so we can fit buildings around it. |
Covered in front - we use vinyl tablecloths with a white underside. It lays flat, allowing figures to stand easily. It is also easy to clean, sturdy and safe. |
Lighthouse and house on a hill are places in the Wilds. To front is another surge protector concealed as Yule village. |
The house on the hill - these wires will all be concealed later. |
The ground cover has to be arranged. The modern village shop is on right.
|
Placing figures - you can see the extension on the right, prior to being covered. |
Modern Village in process of receiving more people |
Click here to return to All Gauge Model Railroading main page